Customization: | Available |
---|---|
Temp. Shock Range: | -40c / -50c / -60c / -70c Optional ~+150c |
Certification: | Ce, RoHS, FCC, ISO, SGS Certificates |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Thermal shock chamber is with separate hot and cold zones, the Automated Thermal Stress System has a patented, retractable product transfer carrier basket that makes full use of the available workspace in both temperature zones for increased product loading and throughput. The product transfer carrier basket reduces the overall height requirements of the chamber and is made as light as possible to minimize thermal loading restraints. Thermotron ATSS chambers can be used as part of most thermal cycling reliability and quality control programs.
Product Image
Three zone
Two zone
Thermal cycle testing can help determine:
• If the product will safety operate after sudden and dramatic temperature changes
• The life expectancy of a product by revealing its aging properties
• With environmental stress screening (ESS) applications
Product Specifications
Model |
ZH-TS-42 (A~D) |
ZH-TS-60 (A~D) |
ZH-TS-80 (A~D) |
ZH-TS-100 (A~D) |
ZH-TS-120 (A~D) |
ZH-TS-150 (A~D) |
Inner size: WHD(cm) | 40*35*30 | 50*30*40 | 50*40*40 | 50*50*40 | 60*40*50 | 60*50*50 |
External size: WHD(cm) | 150*180*150 | 160*175*160 | 160*185*160 | 160*185*170 | 170*185*170 | 170*195* 170 |
Temperature range(Test Chamber) | high temperature:+60ºC~+200ºC;low temperature -10ºC~-65ºC (A:-45ºC;B:-55ºC;C:-65ºC) | |||||
Heating Time | RT~200ºC About 30min | |||||
Cooling Time | RT~-70ºC About 85min | |||||
Temperature Conversion Time | Less than 10S | |||||
Temperature Recovery Time | Less than 5min | |||||
Temperature Deviation | ±2.0ºC | |||||
Temperature Fluctuation | ±0.5ºC | |||||
Material |
External material: SUS#304 Stainless steel plate or Painted shell, Internal material:SUS#304Stainless steel plate |
|||||
Output Mode | Water-cooled or air-cooled,Taikang compressor in France | |||||
Controller | TEMI South Korea | |||||
Cooling System |
Water-cooled or air-cooled, France imported Tecumseh or Germany imported GEA compressor optional |
|||||
Protection devices |
Fuse switch, compressor overload switch, refrigerant high and low pressure protection switch,super humidity over-temperature protection switch, fuse, failure warning system |
|||||
patrs | Watching window; 50mm / 100mm diameter testing hole; 2 pcs of sample shelves | |||||
Power | AC380V 50/60Hz Three-phase four-wire ac power | |||||
weight (kg) | 750 | 790 | 830 | 880 | 950 | 1050 |
Independent R&D operation software(7 languages)
Features
1.Highly accurate temperature recovery
2.1000 cycles continuous operation (option: defrost-free operation)
3.Accurate and dependable test result (option: product temperature control*)
4.Monitoring product temperature (option: product temperature monitor with trigger function)
5.patent parallel refrigeration system improves reliability
6.Automatic setting of pre-cooling and pre-heating in energy saving, Eco operation mode
7.Minimizing defrosting burden with defrost-free operation (option: defrost-free operation)
8.Parallel refrigerator control system for energy-saving control
Company profile
With more than 17 years of experience.
Sailham is a leading manufactuer that specializes in manufacturing and marketing the cost effective& nbsp;and reliable environmental test chambers. Our main products includes:environmental test equipment and mechanical/optical equipment,such as:programmable constant temperature humidity test chamber, high - low temperature cycling test chamber,thermal shock test machine(2zone or 3zone)...
Sailham have got the international advanced ISO9001: 2015 quality management system certification,FCC certification, RoHS certification and SGS/BVcertification and also got the national, high-tech enterprise certificate.
Sailham work with many greatest company in the different industries in the world and provied the professional service
Our Factory
FAQ
Q: What's the payment term?
A: T/T, L/C and other payment terms could be negotiated.
Q: How to Choose a proper chamber?
A: Please let us know the product to be tested, include the max. size, the quantity per test, lowest shock temperature required and power-on test (mainly for electronic products or device) needed or not. We will provide several models to you for reference, the specification sheet in detail will be provided ASAP.
Q:Do you accept customization service?
A:Yes, of course, we can not only offer standard Environmental Chambers, but also customized machines according to your request. Don't hesitate to tell us your requirement, we will try our best to meet your needs.
Q:How about your warranty?
A:Generally, our warranty is one year. Within the warranty period, we can offer technique support, Feedback to you within 24 hours and help you to repair your problem controller freely, even it's not from our factory
Q:Can we visit your factory before order?
A:Yes, we warmly welcome and sincerely invite you or your team to visit our factory, we will help to arrange hotel and pick up you from airport.
Q: What's the delivery term?
A: If we don't have any units in stock. normally, the delivery time is 25 working days after deposit receipt. If you are in urgent need, we can consider making special arrangement for you.
Q:How about the packing for machine, is it safely protected during transportation?
A: Testing Chamber is packed by standard export wooden box (fumigation-free wooden case) for outside package and stretch film for inner package, it won't be damaged. We've delivered many testing machines abroad by sea or by air without damage.
Q: Do you have any certificates for this chamber or for your company?
Yes, we got CE, RoHS and FCC certificates for the normal models. Sailham have also got the SGS and BV certificated, have passed ISO 9001: 2015.
Contact US
Tel :+86-769-81105095
Fax:+86-769-22400804
Website :sailham.en.made-in-china.com
Company Address:1612 Huiyi Fortune Center Building, Intersection of Bulong Rd. and Longguan Rd., Longhua new district, Shenzhen, Guangdong, China
Factory Address: NO.53,Jin Yuan Xin Road,Shi Long Keng,Liao Bu Town. Donggaun. Guangdong China (Mainland)